EXPERIENCE AND PROFESSIONALISM

Natural gas in Miratrevo

05 AUG, 2013

The construction of autonomous unit of natural gas in the textile factory Miratrevo, located in Caíde de Rei, Lousada is already finished and ready to supply natural gas to this plant. The supply of natural gas will be made by the natural gas trading company on the open market Goldenergy.

This small unit consists of a cryogenic tank 2 m3 capacity, incorporating a vaporizer, allowing a flow rate of 50 m3 / h of natural gas, thereby satisfying the energy needs of the plant.

In addition was installed an atmospheric vaporizer with a throughput capacity of 85 m3 / h in order to underpin the integrated vaporizer in the cryogenic tank. These small natural gas units are characterized by their simplicity of construction and efficiency being prepared to remotely communicate all major control parameters, namely the level and tank pressure, the pressure at the outlet of regulation, the outlet temperature of the gas and the gas consumption.

COPYRIGHT REDETECA® 2019. ALL RIGHTS RESERVED

Privacy Policy